Home>Head to Head>4Change Energy vs Cirro Energy
Back to All Providers
4Change Energy
vs
Cirro Energy

4Change Energy vs Cirro Energy: Texas Electricity Head-to-Head

4Change Energy offers 41 plans starting at 6.0c/kWh while Cirro Energy has 61 plans from 6.0c/kWh across all 6 Texas TDU service areas. Here is how their rates, terms, renewable options, and fees compare.

4Change Energy
Cirro Energy
41
Total Plans
61
6.0c
Lowest Rate
at 1,000 kWh
6.0c
13.8c
Average Rate
at 1,000 kWh
14.7c
13.5c
Rate Spread
max minus min
16.4c
8-24 mo
Term Range
10-36 mo
0 (0%)
100% Renewable
plan count
0 (0%)
0
Time-of-Use Plans
0
0
Prepaid Plans
0
$160 - $480
Cancellation Fee
$95 - $395
6 of 6
Service Areas
of 6 TDUs
6 of 6

Rate Curve Comparison

4Change Energy Cirro EnergyBest available rate at each usage level
6c9c12c15c18c500 kWh1,000 kWh2,000 kWhMonthly Usage17.0c6.0c11.3c12.6c6.0c10.2c
Rate Curve Winner: Cirro Energy

Lowest average rate across all usage levels (9.6c/kWh vs 11.4c/kWh). Consistent pricing regardless of how much electricity you use.

Shows the best available all-in rate from each provider at 500, 1,000, and 2,000 kWh usage levels. The best plan may differ at each tier.

Best Plan Per Term Length

Term4Change Energy Best PlanRateFeeCirro Energy Best PlanRateFeeWinner
12 MonthMaxx Saver Value 12View PlanEFL6.0c$240 flatBill Bonus 12View PlanEFL6.0c$150 flatTie
24 MonthMaxx Saver Value 24View PlanEFL7.3c$480 flatBill Bonus 24View PlanEFL6.0c$295 flatCirro Energy
36 MonthN/AN/AN/ASmart Simple 36View PlanEFL15.9c$395 flatCirro Energy

Plan Type Breakdown

4Change Energy

Fixed Rate41 plans (6.0c - 19.5c)
Variable Rate0 plans
Time-of-Use0 plans
Prepaid0 plans
100% Renewable0 plans

Cirro Energy

Fixed Rate61 plans (6.0c - 22.4c)
Variable Rate0 plans
Time-of-Use0 plans
Prepaid0 plans
100% Renewable0 plans

Cancellation Fee Comparison

4Change Energy

Flat Fee Plans41 plans
Per-Month-Remaining Plans0 plans
Average Fee$318.05
No-Fee Plans0 plans (0%)
Fee Range$160 - $480

Cirro Energy

Flat Fee Plans61 plans
Per-Month-Remaining Plans0 plans
Average Fee$198.69
No-Fee Plans0 plans (0%)
Fee Range$95 - $395

Renewable Energy Deep Dive

4Change Energy

100% Renewable Plans0 plans (0%)
Partial / Non-Renewable41 plans
Avg Renewable RateN/A
Avg Overall Rate13.8c
Green PremiumN/A

Cirro Energy

100% Renewable Plans0 plans (0%)
Partial / Non-Renewable61 plans
Avg Renewable RateN/A
Avg Overall Rate14.7c
Green PremiumN/A

Full Plan Tables

Which Provider Fits You Better?

Want a Long-Term Price Lock?

Better fit: Cirro Energy

Cirro Energy has the better option for locking in a rate on a 24-month or longer contract.

These rates are based on 1,000 kWh average usage. Your actual savings depend on YOUR usage pattern.

WattTrim analyzes your real Smart Meter data to find the plan that saves you the most - across all providers, not just these two.

Always Free

Trim My Bill

Frequently Asked Questions

Is 4Change Energy cheaper than Cirro Energy?

4Change Energy and Cirro Energy currently offer very similar lowest advertised rates at 1,000 kWh of usage. The best choice depends on your specific usage pattern, contract term preference, and any add-on fees.

Does 4Change Energy offer renewable energy plans compared to Cirro Energy?

Neither 4Change Energy nor Cirro Energy currently lists any 100% renewable plans in our tracked Texas service areas, though many standard plans include some percentage of renewable content.

What are the cancellation fees for 4Change Energy vs Cirro Energy?

4Change Energy charges $160 - $480 on its tracked plans, while Cirro Energy charges $95 - $395 on its tracked plans. Always review the Electricity Facts Label (EFL) for the exact fee structure before enrolling.

Which provider has more plan options in Texas, 4Change Energy or Cirro Energy?

Cirro Energy currently offers more plan options across the Texas TDU areas we track, with 61 plans compared to 41.

Can I switch from 4Change Energy to Cirro Energy?

Yes. Texas is a deregulated electricity market, so you can switch retail electric providers at any time. If you are still under contract with your current provider, check for an early termination fee before switching. New service with either provider typically starts within 1 to 5 business days of enrollment.